FINAL REPORT
EXECUTIVE SUMMARY
OVERVIEW
THE STRUCTURAL DEPTH COMPONENT OF THIS FINAL REPORT EXPLORED ALTERNATIVES TO BOTH THE GRAVITY AND LATERAL SYSTEMS OF THE EXISTING STRUCTURE. THE GRAVITY SYSTEM WAS CHANGED FROM A COMPOSITE STEEL STRUCTURE TO A SYSTEM CONSISTING OF A TWO-WAY FLAT SLAB WITH DROP PANELS. LATERALLY, THE SYSTEM WENT FROM A COMBINATION OF BRACED AND MOMENT FRAMES TO REINFORCED CONCRETE SHEAR WALLS. IN ADDITION, TWO BREADTH TOPICS WERE INVESTIGATED. FOR THE ACOUSTICAL BREADTH, THE EXISTING ACOUSTICS AND STC RATINGS WERE COMPARED TO THAT OF THE ALTERNATIVE SYSTEM. THE CONSTRUCTION MANAGEMENT BREADTH PROVIDED TWO DETAILED COST ESTIMATES (ONE FOR THE EXISTING SYSTEM AND ONE FOR THE ALTERNATIVE). THESE WERE DONE TO DETERMINE WHETHER THE PROPOSED ALTERNATIVE WOULD BE A FEASIBLE OPTION FOR FUTURE ADDITIONS.
NEWS FEED UPDATES
04/22/2019 CPEP READY FOR FINAL REVIEW
04/14/2019 FINAL PRESENTATION POSTED
04/11/2019 PRESENTATION / THESIS DEFENSE COMPLETED
03/28/2019 PROJECT SCHEDULE MILESTONE 3 ACCOMPLISHED
03/27/2019 PRESENTATION OUTLINE - SAMPLE SLIDES
02/28/2019 PROJECT SCHEDULE MILESTONE 2 ACCOMPLISHED
01/31/2019 PROJECT SCHEDULE MILESTONE 1 ACCOMPLISHED
01/17/2019 PROJECT SCHEDULE 1ST SUBMISSION
01/14/2019 APPROVED PROPOSAL
12/05/2018 PROPOSAL
11/14/2018 TECH REPORT 4
10/23/2018 BUILDING STATISTICS PART 2 - POSTED ON CPEP
10/23/2018 ABSTRACT POSTED ON CPEP
10/19/2018 TECH REPORT 3
10/01/2018 TECH REPORT 2
10/01/2018 BUILDING STATISTICS PART 1 - POSTED ON CPEP
09/28/2018 ABSTRACT COLOR AND CONTENT - ELECTRONIC DRAFT
09/14/2018 BIO SKETCH PEER REVIEW & CORRECTIONS
09/13/2018 BIO SKETCH POSTED
09/12/2018 TECH REPORT 1
09/10/2018 CPEP WEBSITE - FULL MENU FUNCTIONAL
09/03/2018 CPEP HOME PAGE DRAFT
08/31/2018 BUILDING STATISTICS PART 1 - ELECTRONIC DRAFT
08/28/2018 CAREER FAIR HOSTING / EVENT ASSISTANCE SIGN UP
08/27/2018 ATTENDED CPEP SEMINAR
08/27/2018 TURNED IN PROJECT INITIATION CHECKLIST PART 2
08/27/2018 MAILED AE DEPARTMENT THANK YOU LETTER
08/26/2018 RESUME SUBMITTED FOR AE CAREER FAIR
08/24/2018 CONFIRMED MASTER LIST INFORMATION
08/20/2018 TURNED IN PROJECT INITIATION CHECKLIST PART 1
07/31/2018 SENT PERSONAL THANK YOU NOTE
07/31/2018 OBTAINED PROJECT DOCUMENTATION
07/10/2018 OWNER PERMISSION RECEIVED