PRELIMINARY PROPOSAL
FINAL PROPOSAL
STRUCTURAL DEPTH
THE PROPOSED ALTERNATIVE SYSTEM IS A TWO-WAY CONCRETE SLAB. THIS SYSTEM ELIMINATED THE NEED FOR BEAMS, BUT THE COLUMNS WILL NEED TO INCREASE IN SIZE. ALSO, THIS WILL DECREASE THE COST OF LABOR AND POTENTIALLY DECREASE THE COST OF THE STRUCTURAL SYSTEM OVERALL. THE NEW LATERAL FORCE RESISTING SYSTEM FOR THE BUILDING WILL BE CONCRETE SHEAR WALLS. THIS WILL HELP TO SIMPLIFY THE SYSTEM AS A WHOLE.
ACOUSTICAL BREADTH
WITH THE NEWLY PROPOSED CONCRETE SYSTEM, HOPEFULLY THE MEDICAL FACILITY'S COST WILL REDUCE ENOUGH TO INSTALL A NEW ACOUSTICAL SYSTEM. ALTHOUGH THERE HAVE NOT BEEN ANY COMPLAINTS ABOUT THE CURRENT SYSTEM, THERE IS CERTAINLY ROOM FOR IMPROVEMENT. CURRENTLY, THE ROOFING SYSTEM PROVIDES NO SOUND PROOFING. THAT CAN BE IMPROVED WITH A NEW SYSTEM. ALSO, ALTHOUGH ACOUSTICAL CEILING TILES ARE ALREADY IN PLACE, THE ADDITION OF SOUND RETARDING WALLS WILL POSITIVELY IMPACT THE OVERALL EXPERIENCE AT THE MEDICAL FACILITY.
CONSTRUCTION MANAGEMENT BREADTH
WITH THE NEW CONCRETE SYSTEM IN PLACE, THE OVERALL COST OF LABOR AND MATERIALS FOR THE MEDICAL FACILITY SHOULD DECREASE. A ROUGH ESTIMATE AND COST ANALYSIS WILL BE PERFORMED TO DETERMINE WHICH STRUCTURAL SYSTEM (STEEL OR CONCRETE) IS MORE ECONOMICAL. IN ADDITION, THE RESULTS OF THAT COST ANALYSIS WILL ALLOW FOR THE DETERMINATION OF WHETHER OR NOT AN ACOUSTICAL SYSTEM IS AFFORDABLE.
NEWS FEED UPDATES
04/22/2019 CPEP READY FOR FINAL REVIEW
04/14/2019 FINAL PRESENTATION POSTED
04/11/2019 PRESENTATION / THESIS DEFENSE COMPLETED
03/28/2019 PROJECT SCHEDULE MILESTONE 3 ACCOMPLISHED
03/27/2019 PRESENTATION OUTLINE - SAMPLE SLIDES
02/28/2019 PROJECT SCHEDULE MILESTONE 2 ACCOMPLISHED
01/31/2019 PROJECT SCHEDULE MILESTONE 1 ACCOMPLISHED
01/17/2019 PROJECT SCHEDULE 1ST SUBMISSION
01/14/2019 APPROVED PROPOSAL
12/05/2018 PROPOSAL
11/14/2018 TECH REPORT 4
10/23/2018 BUILDING STATISTICS PART 2 - POSTED ON CPEP
10/23/2018 ABSTRACT POSTED ON CPEP
10/19/2018 TECH REPORT 3
10/01/2018 TECH REPORT 2
10/01/2018 BUILDING STATISTICS PART 1 - POSTED ON CPEP
09/28/2018 ABSTRACT COLOR AND CONTENT - ELECTRONIC DRAFT
09/14/2018 BIO SKETCH PEER REVIEW & CORRECTIONS
09/13/2018 BIO SKETCH POSTED
09/12/2018 TECH REPORT 1
09/10/2018 CPEP WEBSITE - FULL MENU FUNCTIONAL
09/03/2018 CPEP HOME PAGE DRAFT
08/31/2018 BUILDING STATISTICS PART 1 - ELECTRONIC DRAFT
08/28/2018 CAREER FAIR HOSTING / EVENT ASSISTANCE SIGN UP
08/27/2018 ATTENDED CPEP SEMINAR
08/27/2018 TURNED IN PROJECT INITIATION CHECKLIST PART 2
08/27/2018 MAILED AE DEPARTMENT THANK YOU LETTER
08/26/2018 RESUME SUBMITTED FOR AE CAREER FAIR
08/24/2018 CONFIRMED MASTER LIST INFORMATION
08/20/2018 TURNED IN PROJECT INITIATION CHECKLIST PART 1
07/31/2018 SENT PERSONAL THANK YOU NOTE
07/31/2018 OBTAINED PROJECT DOCUMENTATION
07/10/2018 OWNER PERMISSION RECEIVED