PRELIMINARY PROPOSAL

FINAL PROPOSAL

Cover Page.PNG
Cover.PNG

STRUCTURAL DEPTH

THE PROPOSED ALTERNATIVE SYSTEM IS A TWO-WAY CONCRETE SLAB.  THIS SYSTEM ELIMINATED THE NEED FOR BEAMS, BUT THE COLUMNS WILL NEED TO INCREASE IN SIZE.  ALSO, THIS WILL DECREASE THE COST OF LABOR AND POTENTIALLY DECREASE THE COST OF THE STRUCTURAL SYSTEM OVERALL.  THE NEW LATERAL FORCE RESISTING SYSTEM FOR THE BUILDING WILL BE CONCRETE SHEAR WALLS.  THIS WILL HELP TO SIMPLIFY THE SYSTEM AS A WHOLE.  

ACOUSTICAL BREADTH

WITH THE NEWLY PROPOSED CONCRETE SYSTEM, HOPEFULLY THE MEDICAL FACILITY'S COST WILL REDUCE ENOUGH TO INSTALL A NEW ACOUSTICAL SYSTEM.  ALTHOUGH THERE HAVE NOT BEEN ANY COMPLAINTS ABOUT THE CURRENT SYSTEM, THERE IS CERTAINLY ROOM FOR IMPROVEMENT.  CURRENTLY, THE ROOFING SYSTEM PROVIDES NO SOUND PROOFING.  THAT CAN BE IMPROVED WITH A NEW SYSTEM.  ALSO, ALTHOUGH ACOUSTICAL CEILING TILES ARE ALREADY IN PLACE, THE ADDITION OF SOUND RETARDING WALLS WILL POSITIVELY IMPACT THE OVERALL EXPERIENCE AT THE MEDICAL FACILITY. 

CONSTRUCTION MANAGEMENT BREADTH

WITH THE NEW CONCRETE SYSTEM IN PLACE, THE OVERALL COST OF LABOR AND MATERIALS FOR THE MEDICAL FACILITY SHOULD DECREASE.  A ROUGH ESTIMATE AND COST ANALYSIS WILL BE PERFORMED TO DETERMINE WHICH STRUCTURAL SYSTEM (STEEL OR CONCRETE) IS MORE ECONOMICAL.  IN ADDITION, THE RESULTS OF THAT COST ANALYSIS WILL ALLOW FOR THE DETERMINATION OF WHETHER OR NOT AN ACOUSTICAL SYSTEM IS AFFORDABLE.  

2-Web Photo_0.jpg

NEWS FEED UPDATES

04/22/2019 CPEP READY FOR FINAL REVIEW

04/14/2019 FINAL PRESENTATION POSTED

04/11/2019 PRESENTATION / THESIS DEFENSE COMPLETED

04/01/2019 FINAL REPORT

03/28/2019 PROJECT SCHEDULE MILESTONE 3 ACCOMPLISHED

03/27/2019 PRESENTATION OUTLINE - SAMPLE SLIDES 

02/28/2019 PROJECT SCHEDULE MILESTONE 2 ACCOMPLISHED

01/31/2019 PROJECT SCHEDULE MILESTONE 1 ACCOMPLISHED

01/17/2019 PROJECT SCHEDULE 1ST SUBMISSION

01/14/2019 APPROVED PROPOSAL

12/05/2018 PROPOSAL

11/14/2018 TECH REPORT 4

10/23/2018 BUILDING STATISTICS PART 2 - POSTED ON CPEP

10/23/2018 ABSTRACT POSTED ON CPEP

10/19/2018 TECH REPORT 3

10/01/2018 TECH REPORT 2 

10/01/2018 BUILDING STATISTICS PART 1 - POSTED ON CPEP

09/28/2018 ABSTRACT COLOR AND CONTENT - ELECTRONIC DRAFT

09/14/2018 BIO SKETCH PEER REVIEW & CORRECTIONS

09/13/2018 BIO SKETCH POSTED 

09/12/2018 TECH REPORT 1

09/10/2018 CPEP WEBSITE - FULL MENU FUNCTIONAL

09/03/2018 CPEP HOME PAGE DRAFT

08/31/2018 BUILDING STATISTICS PART 1 - ELECTRONIC DRAFT

08/28/2018 CAREER FAIR HOSTING / EVENT ASSISTANCE SIGN UP 

08/27/2018 ATTENDED CPEP SEMINAR

08/27/2018 TURNED IN PROJECT INITIATION CHECKLIST PART 2

08/27/2018 MAILED AE DEPARTMENT THANK YOU LETTER 

08/26/2018 RESUME SUBMITTED FOR AE CAREER FAIR

08/24/2018 CONFIRMED MASTER LIST INFORMATION

08/20/2018 TURNED IN PROJECT INITIATION CHECKLIST PART 1

07/31/2018 SENT PERSONAL THANK YOU NOTE

07/31/2018 OBTAINED PROJECT DOCUMENTATION

07/10/2018 OWNER PERMISSION RECEIVED